Kiểm tra công tơ

Kiểm tra công tơ

Kiểm tra công tơ

29/11/2026

Hotline: 028 221 78978

Check the meter

1. Responsibility to protect the meter
Customers are responsible for protecting electricity meters placed within the scope of their management as agreed in the electricity purchase contract. In case the electricity meter is lost, it must be compensated or damaged to pay for the repair or testing.
It is not allowed to unload, move electric meter. Where there is a need to move the meter to another location, the consent of the electricity seller must be obtained and the transportation cost must be met.
2. Request for inspection
- When there is doubt that the electricity meters are inaccurate, customers may request the electricity sellers to check. Within 3 days after receiving requests from customers, the electricity sellers shall have to check, repair or replace them.
- In case of disagreement with inspection results, repair or replacement of electricity sellers, customers may request the State management agencies in charge of electricity activities and use in their respective localities to organize inspection independence. Within 15 days after receiving the requests of customers, the local agencies in charge of State management over electricity activities and use shall have to organize the expertise.
3. Expenses for expertise of electricity measurement and counting equipment
- Customers have to pay the inspection fee in case the independent testing organization determines that the electricity measuring and measuring equipment operates in accordance with Vietnamese standards.
- The electricity seller must pay the inspection fee in case the independent expertising organization determines that the electricity measuring and counting equipment does not meet the Vietnamese standards.
4. Electricity payment
4.1. In case of inaccurate measurement equipment
a / If the time for measuring and counting equipment is inaccurate, the electricity seller shall have to refund the actual electricity amount already collected in excess of or recover the electricity bill due to the customer;
b) If the electricity meter can not be identified quickly, the electricity seller shall have to refund the surplus electricity charge paid by the customer according to the calculation time limit of one cycle, The period is using electricity but not to date the index.
4.2. In case the electricity meter is damaged, the meter will stop working
In cases where customers use electricity during the period when the electricity meter-measuring equipment is damaged so that the electricity meter stops working, the electricity charge to be paid shall be calculated according to the average daily electricity of the 3 cycles recording the industrial index the previous connected electricity multiplied by the number of days of actual use of electricity. The actual number of days of electricity use shall be counted from the time the meter stops working or is stored in the memory of the electricity meter or from the date of recording the nearest electricity meter in case the electricity meter fails to save the time. Shut down operation until the date the power meter system is restored.
4.3. Where electricity meter is lost
In cases where customers use electricity during the time when the electricity meters are lost, the electricity charges to be paid shall be calculated according to the average daily electricity of three cycles recording the preceding electricity meter index multiplied by the number of actual days used. The electricity used, the actual number of days of electricity use shall be calculated from the date of recording the electricity meter index nearest to the date the electricity meter is installed and resumed.